Pascal and Francis Bibliographic Databases

Help

Search results

Your search

kw.\*:("SOUDAGE HYPERBARE")

Document Type [dt]

A-Z Z-A Frequency ↓ Frequency ↑
Export in CSV

Publication Year[py]

A-Z Z-A Frequency ↓ Frequency ↑
Export in CSV

Discipline (document) [di]

A-Z Z-A Frequency ↓ Frequency ↑
Export in CSV

Language

A-Z Z-A Frequency ↓ Frequency ↑
Export in CSV

Author Country

A-Z Z-A Frequency ↓ Frequency ↑
Export in CSV

Origin

A-Z Z-A Frequency ↓ Frequency ↑
Export in CSV

Results 1 to 25 of 57

  • Page / 3
Export

Selection :

  • and

Welding at 300 m depth in the North Sea = Soudage à 300 m de profondeur en mer du Nord1985, Vol 4, Num 1, pp 35-36, issn 0262-642XArticle

THE CHALLENGE OF DEEP SEA DIVING = LES PROBLEMES DE LA PLONGEE EN EAU PROFONDEBATEMAN COOKE MC.1981; UNDERWATER WELDING OF OFFSHORE PLATFORMS AND PIPELINES. CONFERENCE/1980/NEW ORLEANS; USA; MIAMI: AWS; DA. 1981; PP. 1-9; LOC. ISConference Paper

MEDIZINISCHE ASPEKTE DES UNTERWASSERSCHWEISSENS = MEDICAL ASPECTS OF UNDERWATER WELDING = ASPECTS MEDICAUX DU SOUDAGE SOUS L'EAUHOLTHAUS J.1983; UNTERWASSERSCHWEISSEN UND -SCHNEIDEN; DEU; DUESSELDORF: DVS; DA. 1983; PP. 46-52; BIBL. 6 REF.; LOC. ISBook Chapter

VERSUCHSEINRICHTUNG FUER DIE ENTWICKLUNG UND ERPROBUNG VON UNTERWASSERARBEITSVERFAHREN UND -GERAETEN = TESTING STATIONS FOR THE DEVELOPMENT AND TRIAL OF UNDERWATER OPERATION EQUIPMENT AND PROCESSES = INSTALLATIONS D'ESSAI DESTINEES AU DEVELOPPEMENT ET A LA MISE A L'EPREUVE DE PROCEDES ET D'APPAREILS DE TRAVAIL SOUS L'EAUSCHAFSTALL HG.1983; UNTERWASSERSCHWEISSEN UND -SCHNEIDEN; DEU; DUESSELDORF: DVS; DA. 1983; PP. 61-67; LOC. ISBook Chapter

REPAIRING DEEP SEA PIPELINES AND STRUCTURES = REPARATION DES PIPELINES ET DE STRUCTURES EN HAUTE MERCORIATT G.1979; WELDG DESIGN FABRIC.; USA; DA. 1979; NO 7; PP. 60-64; LOC. ISArticle

GERAETETRAEGER FUER SCHWEISSTECHNISCHE AUSRUESTUNGEN = CANCER UNITS FOR UNDERWATER WELDING EQUIPMENT = UNITES PORTEUSES DES MATERIELS DE SOUDAGE SOUS L'EAUHENNING K.1983; UNTERWASSERSCHWEISSEN UND -SCHNEIDEN; DEU; DUESSELDORF: DVS; DA. 1983; PP. 33-35; LOC. ISBook Chapter

WELDED VESSELS LET U.S. NAVY DIVERS WORK UNDER PRESSURE = DES ENCEINTES SOUDEES PERMETTENT AUX PLONGEURS DE L'US NAVY DE TRAVAILLER SOUS PRESSION1981; WELD. DES. FABR.; ISSN 0043-2253; USA; DA. 1981; VOL. 54; NO 3; PP. 111-113; LOC. ISArticle

TRAITEMENTS THERMIQUES PRE ET POST SOUDAGE APPLIQUES AUX SOUDURES HYPERBARES = HEAT TREATMENTS BEFORE AND AFTER WELDING APPLIED TO HYPERBARIC WELDSCORIATT G.1979; SOUDAGE ET TRAITEMENTS THERMIQUES. JOURNEES DE CONFERENCE/1978/MARSEILLE; FRA; PARIS: PSA; DA. 1979; 20 P.; LOC. ISConference Paper

Un robot de seconde génération pour la soudure hyperbare = A robot of the second generation for hyperbaric weldingGUERRIER, G.Arts & métiers (Paris. 1951). 1984, Num 6, pp 37-39, issn 0004-4008Article

Welding in high pressure CO2 atmospheres = Soudage sous CO2 hyperbareSONG TIANHU; HUO WELGUO.Quality and reliability in welding. International conference. 1984, pp D.11.1-D.11.6Conference Paper

PHYSIOLOGICAL AND MEDICAL ASPECTS OF DEEP DIVING IN MARINE TECHNOLOGY RESEARCH = ASPECTS PHYSIOLOGIQUES ET MEDICAUX DE LA PLONGEE EN EAU PROFONDEBENNETT P.1983; UNDERWATER WELDING AND CUTTING. INTERNATIONAL SYMPOSIUM/1983/GEESTHACHT; DEU; GEESTHACHT: GKSS; DA. 1983; PP. 24-32; BIBL. 37 REF.Conference Paper

STAND DER TAUCHTECHNISCHERS VORSCHRIFTEN = PRESENT LEVEL OF REGULATION ON DIVING = NIVEAU ACTUEL DE LA REGLEMENTATION RELATIVE AUX OPERATIONS DE PLONGEELUTHER G.1983; UNTERWASSERSCHWEISSEN UND -SCHNEIDEN; DEU; DUESSELDORF: DVS; DA. 1983; PP. 52-54; BIBL. 8 REF.; LOC. ISBook Chapter

DIVERS COMPLETE STRAIT OF MAGELLAN TIE-INCLEMENT R.1979; PIPELINE GAS J.; USA; DA. 1979; VOL. 206; NO 4; PP. 23-24Article

GAS-CLEANING IN UNDERWATER WELDING CHAMBERS UNDER HYPERBARIC CONDITIONS = L'EPURATION DES GAZ DANS LES CAISSONS DE SOUDAGE HYPERBAREMEWES D.1983; UNDERWATER WELDING AND CUTTING. INTERNATIONAL SYMPOSIUM/1983/GEESTHACHT; DEU; GEESTHACHT: GKSS; DA. 1983; PP. 127-132; LOC. ISConference Paper

PROBLEMS ENCOUNTERED IN UNDERWATER WELDING: FACILITIES AVAILABLE FOR THE STUDY OF CERTAIN PARAMETERS IN A SIMULATION CHAMBER = LES PROBLEMES EN SOUDAGE SOUS L'EAU: LES INSTALLATIONS POUR L'ETUDE DE CERTAINS PARAMETRES DANS UNE ENCEINTE DE SIMULATIONGAUDIN JP; SUDREAU BG.1981; UNDERWATER WELDING OF OFFSHORE PLATFORMS AND PIPELINES. CONFERENCE/1980/NEW ORLEANS; USA; MIAMI: AWS; DA. 1981; PP. 155-173; LOC. ISConference Paper

HYPERBARIC WELDING IN THE REPAIR OF OFFSHORE PIPELINES AND STRUCTURES = LE SOUDAGE HYPERBARE POUR LA REPARATION DES PIPE-LINES ET CONTRUCTIONS EN MERCORIATT G.1981; UNDERWATER WELDING OF OFFSHORE PLATFORMS AND PIPELINES. CONFERENCE/1980/NEW ORLEANS; USA; MIAMI: AWS; DA. 1981; PP. 49-67; LOC. ISConference Paper

FORTSCHRITTE BEIM HYPERBAREN SCHWEISSEN BIS IN GROSSE WASSERTIEFEN INFOLGE DER MEEREOTECHNIKENTWICKLUNG = DEVELOPMENT OF HYPERBARIC WELDING FOR LOW DEPTHS = PROGRES ACCOMPLIS EN SOUDAGE HYPERBARE A GRANDE PROFONDEUR PAR SUITE DES PERFECTIONNEMENTS REALISES DANS LE DOMAINE DES TECHNIQUES OFFSHORESCHAEFER R; SCHAFSTALL HG.1981; SCHWEISSEN+SCHNEIDEN; ISSN 0036-7184; DEU; DA. 1981; VOL. 33; NO 3; PP. 114-122; BIBL. 128 REF.; IDEM ENG; LOC. ISArticle

PIPE-LINE SOUS-MARIN: SOUDAGE PAR INDUCTION HAUTE FREQUENCE = SUBMARINE PIPELINE: HIGH FREQUENCY INDUCTION WELDINGBARBINI S.1980; MACH. MOD.; ISSN 0024-9130; FRA; DA. 1980; NO 846; PP. 26-29; LOC. ISArticle

CONSTRUCTION AND REPAIR OF SUBSEA PIPELINES = CONSTRUCTION ET REPARATION DES CANALISATIONS SOUS-MARINESSNEESBY AP; WESTMORELAND GD.1979; INTERNATIONAL CONFERENCE PIPEWELDING. 2/1979/LONDON; GBR; ABINGTON: WELDING INSTITUTE; DA. 1979; PP. 253-264; LOC. ISConference Paper

Overcoming problems in hyperbaric welding = Solution des problèmes posés en soudage hyperbareALLUM, C. J.Welding and metal fabrication. 1983, Vol 51, Num 7, pp 315-320, issn 0043-2245Article

Damaged brace on offshore platform replaced using hyperbaric welding. I. Preparation = Remplacement des entretoises endommagées de plates-formes offshore par soudage hyperbare. I. PréparationSTEVENSON, A. W; SLEVELAND, A.Metal construction. 1983, Vol 15, Num 12, pp 720-723, issn 0307-7896Article

PHYSIOLOGICAL LIMITS OF HYPERBARIC WELDING CONTAMINANTS = LIMITES PHYSIOLOGIQUES DES CONTAMINANTS PRODUITS LORS DU SOUDAGE HYPERBAREHAMILTON RW.1983; UNDERWATER WELDING AND CUTTING. INTERNATIONAL SYMPOSIUM/1983/GEESTHACHT; DEU; GEESTHACHT: GKSS; DA. 1983; PP. 38-43; BIBL. 14 REF.; LOC. ISConference Paper

UNTER WASSERSCHWEISSEN UND -SCHNEIDEN = UNDERWATER WELDING AND CUTTING = LE SOUDAGE ET LE COUPAGE SOUS L'EAU1983; ; DEU; DUESSELDORF: DVS; DA. 1983; 100 P.; 30 CM; BIBL. DISSEM.; ISBN 3-87155-361-1; LOC. ISBook

Power sources for hyperbaric underwater arc welding = Sources de courent pour la soudage à l'arc hyperbareGERHARDT, A; JUNG, W.Metal construction. 1985, Vol 17, Num 7, pp 440-442, issn 0307-7896Article

Development of dry-type underwater welding system in Japan = Mise au point d'un système de soudage sous l'eau sous enceinte hyperbareYAMASHITA, S; NAKAYAMA, S; MATSUI, S et al.Fundamental and practical approaches to the reliability of welded structures. International symposium. 1982, pp 187-191Conference Paper

  • Page / 3